Kristijan Šilak s.p. — Slovenia / EU

CLMONT

Where fabrication ends, fitting begins.

Interior installation & assembly — on board mega yachts

Scroll

Position

The interior is finished on board, not in a workshop.

Joinery, stone, leather, veneer — the components already exist by the time CL-MONT reaches the vessel. Our work begins where fabrication ends: fitting each element into a hull that was never perfectly square to begin with, aligning it to the surfaces around it by eye and by laser, and closing the seam so it reads as one continuous piece.

Every element arrives finished and unforgiving. A panel cut for a drawing has to sit in a structure that has moved since it was measured, next to work installed by other trades, on a schedule set by the yard. That is the position CL-MONT occupies, and the only one.

There is no second interior behind the first. The tolerance is the job.

Deck by deck

Follow the crew down through the vessel.

An outfit is not one job. Each deck presents its own materials, its own access and its own tolerance — and each is installed by the same crew, working downward as the vessel comes together.

01Owner's Deck

Joinery set into a hull that was never square.

Cabinetry, wardrobes and wall panels arrive finished. CL-MONT sets them into a structure built to marine tolerances rather than furniture ones — scribing, shimming and securing each unit until doors swing true and every reveal holds its line the length of the space.

  • Joinery & cabinetry — precision fitting
  • Veneer panels — installation, alignment & grain continuity
Fig. 01 — Veneer panel, offered up and clamped

02Guest Deck / Main Salon

Stone and leather, fitted without a visible fixing.

Marble and stone panels are offered up, supported and set so the weight sits where the structure can carry it. Leather and upholstered elements are installed to the same lines — stitch runs continuing across a bulkhead break as though the surface were never interrupted.

  • Marble & stone panel fitting
  • Leather & upholstery installation
Fig. 02 — Stone panel, dry-fitted before bonding

03Crew & Technical

Where the fit still has to survive the machinery.

Lighting is integrated into finished ceilings once the electrical trades have second-fixed, and refit work is carried out in spaces that are still live. The tolerance does not loosen down here — only the access does.

  • Lighting fixture integration
  • Technical & refit installation
Fig. 03 — Fixture aperture, cut and trimmed on board

Process

Five stages, one vessel.

  1. Stage 01

    Site survey & fit-check

    Before a single panel moves on board, CL-MONT surveys the space against the fabricator's drawings — checking real-world tolerances against the vessel as built, not as drawn.

  2. Stage 02

    Coordination with fabricators & yard schedule

    Installation windows are set against the yard's build programme and the fabricators' delivery dates, so components arrive ready to fit — not ready to wait.

  3. Stage 03

    On-board installation

    Elements are fitted in place: scribed, shimmed, mounted and secured to the tolerances the vessel — not the drawing — actually allows.

  4. Stage 04

    Alignment & finishing

    Reveals, seams and returns are trued and finished until the work reads as a single, continuous interior rather than a set of installed parts.

  5. Stage 05

    Sign-off & sea trial handover

    The installation is inspected, signed off and proven under way — verified once the vessel is doing what it was built to do.

Tolerance & care

The whole job is decided in the last millimetre.

Nothing below is a finish applied for effect. Each is a joint that had to close, on a surface that could not be adjusted afterwards.

Flush brass inlay, salon threshold

01 / 03Reveal ±0.3 mm

Veneer-to-bulkhead seam, hand-finished

02 / 03Gap closed — 0.2 mm

Laser reference, panel set and held

03 / 03Set ±0° 02′

By the numbers

Years active
0yrs
Yachts outfitted
0vessels
Shipyards worked with
0yards

Get in touch

Discuss an installation on your next build.

Send the drawings, the deck and the delivery window. We will tell you what it takes to fit it — and when we can be on board.

Company
CL-MONT, Kristijan Šilak s.p.
Address
Negova 52, 9245 Spodnji Ivanjci, Slovenia
CL-MONT — Interior installation & assemblySlovenia / EU2026powered by WatchOwl